PA rejects valley side fireworks factory
The permit was originally rejected in 2018 but the case was sent back to the board by the Environment and Planning Review Tribunal after the Malta Air Traffic Services (MATS)...
Absence of colour implies  that no change took place
The Tribunal concluded that the Authority was correct to assume that the store had a clear height of 2.37 metres as held in the original pemit, thus failing to meet the minimum...
Application dismissed due to persisting illegal activity

Sanctioning applications are dismissed if the order or notice requires the...

Sanctioning applications are dismissed if the order or...

Permission granted subject to a reduction in floor space

Rehabilitation allowed in view of the building’s vernacular...

Rehabilitation allowed in view of the building’s...

Permit for Santa Venera fire station confirmed

When a fire engine vehicle goes out from the fire station, the beacon light and...

When a fire engine vehicle goes out from the fire station,...

Garage opening in Triq San Trofimu seen incompatible

A Sliema townhouse formed part of a short stretch of townhouses having...

A Sliema townhouse formed part of a short stretch of...

Billboard approved despite chosen location

The location of the billboard was deemed acceptable as it was ‘congruent...

The location of the billboard was deemed acceptable as it...

Ghaxaq Council declaration saves application

Tribunal convinced of one and same address – Changes due to 1995...

Tribunal convinced of one and same address –...

Hamrun multi-storey approved as being according to local plan

A development planning application contemplating the demolition of a...

A development planning application contemplating the...

Senglea local council loses appeal

The tribunal underlined that the council failed to substantiate its allegations

The tribunal underlined that the council failed to...

Receipt of payment produced before EPRT

The Tribunal observed that the applicant had produced a copy of receipt to show that payment was indeed made on 27 September, 2016

The Tribunal observed that the applicant had produced a...

UCA roof extension rejected

In UCAs, the setback from the façade must never be less than that of the committed adjacent properties on one or both sides

In UCAs, the setback from the façade must never be...

Wooden canopy on Sliema roof refused

The Tribunal held that no structures should be permitted which could possibly detract from the traditional urban skyline

The Tribunal held that no structures should be permitted...

Kiosk extension considered minimal

The Tribunal concluded that the proposed extension was minimal and the Authority was consequently ordered to issue the relative planning permit

The Tribunal concluded that the proposed extension was...

Trending
Farmer in need of storage

The proposal was deemed acceptable since the proposed interventions would mitigate a two storey blank wall

The proposal was deemed acceptable since the proposed...

Platform needs planning permission

A trading license does not give the holder a right to undertake construction works without a valid planning permit

A trading license does not give the holder a right to...

Rubble wall serving no agricultural purpose refused

The Tribunal considered that the rubble walls served no agricultural purpose...

The Tribunal considered that the rubble walls served no...

Adjacent site did not create a ‘strong’ precedent

Any positive benefits resulting from the screening of the existing blank party...

Any positive benefits resulting from the screening of the...

Application turned down due to illegalities

The appellant evidently failed to take action with regard to the site...

The appellant evidently failed to take action with regard...

No to reconstruction of ODZ remnants

The Environment and Planning Review Tribunal asserted that ODZ interventions should only be allowed if genuinely required to complement the...

The Environment and Planning Review...